Corvex
#37of 95 neoclouds · score 11/100
Corvex delivers reserved accelerator clusters with a choice of bare metal, Kubernetes or Slurm. Sources below.
How Corvex scores
Weights and formula| Signal | Value | Points | Weight | Adds |
|---|---|---|---|---|
| ClusterMAX tier | Unavailable | 0.0 | 30% | 0.0 |
| Contracted power | 8 MW | 33.9 | 20% | 6.8 |
| Contracted backlog | Not disclosed | 0.0 | 15% | 0.0 |
| Capital raised | $33M | 28.3 | 15% | 4.2 |
| GPUs | Not disclosed | 0.0 | 10% | 0.0 |
| Named customers | Not disclosed | 0.0 | 10% | 0.0 |
| Composite score (rank #37 of 95) | 11.0 | |||
This dataset has no verified contracted backlog, GPUs or named customers, so those signals score 0. A sourced figure sent to hello@neocloudrankings.com goes straight into the next build.
Signals and facts
Source per value- ClusterMAX Tier in SemiAnalysis ClusterMAX 3.0 (23 Sep 2026), the public hands-on rating of GPU clouds. Medal tiers run Platinum, Gold, Silver, Bronze; Participation Ribbon sits between Bronze and Underperforming. Underperforming and Unavailable are the two groups SemiAnalysis lists under "Not Recommended": Unavailable covers providers it could not test or judged too small to rate. Empty when the provider is not listed.
- Unavailable 4
- Contracted power MW Power the company states as contracted, secured or committed in its portfolio, in MW. Speculative pipeline and planned campuses are excluded; the power note quotes the company's own word for it.
- 8 3
- Active power MW Power the company states as active, live, operational or managed today, in MW.
- 1.5 3
- Power note What the power figures cover, the as-of date, and targets or planned campuses that are not counted.
- Corvex secured approximately 8 MW, with 1.5 MW live at its third-quarter update. 3
- Backlog $M Contracted revenue backlog, remaining performance obligations or total contracted value as the company states it, in USD millions.
- Not published
- Backlog note Which backlog measure the company uses and its as-of date.
- Not published
- Quarterly revenue $M Latest reported quarterly revenue, in USD millions, from the company's results release or filing. Company-level unless the note says otherwise.
- Not published
- Stated ARR $M Annualized run-rate revenue exactly as the company states it, in USD millions. We never annualize a quarter ourselves.
- Not published
- Revenue note Period, basis and any revenue targets the company has stated.
- Not published
- GPUs GPUs deployed, owned or under contract as the company states it.
- Not published
- GPU note What the GPU figure counts and when it was stated.
- Not published
- Capital raised $M Equity and debt raised, in USD millions: the total when the company states one, otherwise the rounds and facilities named in the capital note.
- 33 3
- Capital note Exactly which rounds, notes or facilities the capital figure covers, with dates.
- September 2026 private placement, approximately $33 million in gross proceeds. 3
- Customers Customers named publicly by the company, in its filings or in reputable press.
- Not published
- Ownership Publicly listed, privately held, or a subsidiary of another company.
- public 2
- Ticker Exchange and ticker symbol for listed companies.
- Not published
- Parent Owner or majority shareholder when the neocloud is part of another group.
- Not published
- Quarterly capex $M Latest disclosed quarterly capital expenditures, in USD millions. Context only; excluded from the composite score.
- Not published
- Capex note Period and scope of capital expenditures, including whether figures are actuals or guidance.
- Not published
- GPU models Hardware advertised or tested, with reservations and future availability explicitly noted. Context only; not a fleet count or scoring input.
- NVIDIA H200, B200 and B300 1
- Operating footprint Company or service geography as sourced; a general cloud footprint does not guarantee GPU stock in each region.
- Not published
- Deployment and orchestration Available provisioning and cluster management services; future features are labelled as such.
- Kubernetes, Slurm or bare metal 1
- Cluster interconnect Published cluster network technology or bandwidth; not a measured service-quality claim.
- Not published
- Capacity scope Partner supply, network coverage and other non-fleet capacity signals excluded from GPU scoring.
- Not published
Sources
- Corvex disclosure accessed 2026-11-18
- Corvex disclosure accessed 2026-11-18
- Provider disclosure accessed 2026-11-18
- SemiAnalysis ClusterMAX 3.0, provider reviews, September 2026 accessed 2026-11-18
Get GPU capacity from Corvex and similar neoclouds
Write it once. Neocloud Rankings passes it to matching neoclouds, and their replies come straight to your inbox.