AI infrastructure operator designing, commissioning and managing GPU clusters across partner facilities. Its pipeline targets and team delivery track record are recorded separately from current capacity. Sources below.

PrivateEuropeUS

Verified

Visit CUDO Compute Compare with neighbours Request GPU capacity

How CUDO Compute scores

Weights and formula
SignalValuePointsWeightAdds
ClusterMAX tier Unavailable 0.0 30% 0.0
Contracted power Not disclosed 0.0 20% 0.0
Contracted backlog Not disclosed 0.0 15% 0.0
Capital raised Not disclosed 0.0 15% 0.0
GPUs Not disclosed 0.0 10% 0.0
Named customers Not disclosed 0.0 10% 0.0
Composite score (rank #46 of 51)0.0

This dataset has no verified contracted power, contracted backlog, capital raised, GPUs or named customers, so those signals score 0. A sourced figure sent to hello@neocloudrankings.com goes straight into the next build.

Signals and facts

Source per value
ClusterMAX Tier in SemiAnalysis ClusterMAX 3.0 (23 Sep 2026), the public hands-on rating of GPU clouds. Medal tiers run Platinum, Gold, Silver, Bronze; Participation Ribbon sits between Bronze and Underperforming. Underperforming and Unavailable are the two groups SemiAnalysis lists under "Not Recommended": Unavailable covers providers it could not test or judged too small to rate. Empty when the provider is not listed.
Unavailable 2
Contracted power MW Power the company states as contracted, secured or committed in its portfolio, in MW. Speculative pipeline and planned campuses are excluded; the power note quotes the company's own word for it.
Not published
Active power MW Power the company states as active, live, operational or managed today, in MW.
Not published
Power note What the power figures cover, the as-of date, and targets or planned campuses that are not counted.
Capacity pipeline: 250 MW+ contracted by end 2026 and 750 MW+ targeted by end 2027. Neither is a current contracted-MW disclosure at the 11 Nov cutoff, so both are excluded from scoring. 1
Backlog $M Contracted revenue backlog, remaining performance obligations or total contracted value as the company states it, in USD millions.
Not published
Backlog note Which backlog measure the company uses and its as-of date.
Not published
Quarterly revenue $M Latest reported quarterly revenue, in USD millions, from the company's results release or filing. Company-level unless the note says otherwise.
Not published
Stated ARR $M Annualized run-rate revenue exactly as the company states it, in USD millions. We never annualize a quarter ourselves.
Not published
Revenue note Period, basis and any revenue targets the company has stated.
Not published
GPUs GPUs deployed, owned or under contract as the company states it.
Not published
GPU note What the GPU figure counts and when it was stated.
The 40,000+ GPUs statement describes the engineering team’s collective track record across partnerships and direct operations, not a verified current CUDO fleet. 1
Capital raised $M Equity and debt raised, in USD millions: the total when the company states one, otherwise the rounds and facilities named in the capital note.
Not published
Capital note Exactly which rounds, notes or facilities the capital figure covers, with dates.
Not published
Customers Customers named publicly by the company, in its filings or in reputable press.
Not published
Ownership Publicly listed, privately held, or a subsidiary of another company.
private 1
Ticker Exchange and ticker symbol for listed companies.
Not published
Parent Owner or majority shareholder when the neocloud is part of another group.
Not published
Quarterly capex $M Latest disclosed quarterly capital expenditures, in USD millions. Context only; excluded from the composite score.
Not published
Capex note Period and scope of capital expenditures, including whether figures are actuals or guidance.
Not published
GPU models Hardware advertised or tested, with reservations and future availability explicitly noted. Context only; not a fleet count or scoring input.
NVIDIA H100 and H200 deployed in the company case study; newer architectures advertised separately. 1
Operating footprint Company or service geography as sourced; a general cloud footprint does not guarantee GPU stock in each region.
Not published
Deployment and orchestration Available provisioning and cluster management services; future features are labelled as such.
Not published
Cluster interconnect Published cluster network technology or bandwidth; not a measured service-quality claim.
InfiniBand and Ethernet cluster design. 1
Capacity scope Partner supply, network coverage and other non-fleet capacity signals excluded from GPU scoring.
Team delivery and operating experience across 40,000+ GPUs is excluded from the current fleet total. 1

Sources

  1. CUDO Compute accessed 2026-11-11
  2. ClusterMAX 3.0 (SemiAnalysis, 23 Sep 2026) accessed 2026-11-11

GPU prices, regions and services for CUDO Compute: CUDO Compute on Neocloud Companies.

Get GPU capacity from CUDO Compute and similar neoclouds

Tell us what you need once. We send it to matching neoclouds and they reply to you directly.

Quote requests open shortly. To get in first, email hello@neocloudrankings.com.