TensorWave
#5of 51 neoclouds · score 50.7/100
AMD-only GPU cloud renting Instinct MI300X, MI325X, MI355X and MI455X clusters. It has raised over $500M and rates Silver in ClusterMAX 3.0. Sources below.
Visit TensorWave Compare with neighbours Request GPU capacity
How TensorWave scores
Weights and formula| Signal | Value | Points | Weight | Adds |
|---|---|---|---|---|
| ClusterMAX tier | Silver | 70.0 | 30% | 21.0 |
| Contracted power | 2 GW | 82.5 | 20% | 16.5 |
| Contracted backlog | Not disclosed | 0.0 | 15% | 0.0 |
| Capital raised | $500M | 58.5 | 15% | 8.8 |
| GPUs | 8,192 | 34.5 | 10% | 3.5 |
| Named customers | 1 named | 10.0 | 10% | 1.0 |
| Composite score (rank #5 of 51) | 50.7 | |||
This dataset has no verified contracted backlog, so that signal scores 0. A sourced figure sent to hello@neocloudrankings.com goes straight into the next build.
Signals and facts
Source per value- ClusterMAX Tier in SemiAnalysis ClusterMAX 3.0 (23 Sep 2026), the public hands-on rating of GPU clouds. Medal tiers run Platinum, Gold, Silver, Bronze; Participation Ribbon sits between Bronze and Underperforming. Underperforming and Unavailable are the two groups SemiAnalysis lists under "Not Recommended": Unavailable covers providers it could not test or judged too small to rate. Empty when the provider is not listed.
- Silver 2
- Contracted power MW Power the company states as contracted, secured or committed in its portfolio, in MW. Speculative pipeline and planned campuses are excluded; the power note quotes the company's own word for it.
- 2,000 3
- Active power MW Power the company states as active, live, operational or managed today, in MW.
- Not published
- Power note What the power figures cover, the as-of date, and targets or planned campuses that are not counted.
- More than 2 GW of long-term data center capacity secured (10 Jun 2026 Series B announcement). Secured capacity includes future deployments; active MW not stated. 3
- Backlog $M Contracted revenue backlog, remaining performance obligations or total contracted value as the company states it, in USD millions.
- Not published
- Backlog note Which backlog measure the company uses and its as-of date.
- Not published
- Quarterly revenue $M Latest reported quarterly revenue, in USD millions, from the company's results release or filing. Company-level unless the note says otherwise.
- Not published
- Stated ARR $M Annualized run-rate revenue exactly as the company states it, in USD millions. We never annualize a quarter ourselves.
- Not published
- Revenue note Period, basis and any revenue targets the company has stated.
- Not published
- GPUs GPUs deployed, owned or under contract as the company states it.
- 8,192 3
- GPU note What the GPU figure counts and when it was stated.
- 8,192 AMD Instinct MI325X GPUs online in a North American training cluster, stated 10 Jun 2026. This is a disclosed cluster count, not a claimed current total across all models. 3
- Capital raised $M Equity and debt raised, in USD millions: the total when the company states one, otherwise the rounds and facilities named in the capital note.
- 500 1
- Capital note Exactly which rounds, notes or facilities the capital figure covers, with dates.
- Over $500M raised in total (company about page). 1
- Customers Customers named publicly by the company, in its filings or in reputable press.
- Moreh 4
- Ownership Publicly listed, privately held, or a subsidiary of another company.
- private 1
- Ticker Exchange and ticker symbol for listed companies.
- Not published
- Parent Owner or majority shareholder when the neocloud is part of another group.
- Not published
- Quarterly capex $M Latest disclosed quarterly capital expenditures, in USD millions. Context only; excluded from the composite score.
- Not published
- Capex note Period and scope of capital expenditures, including whether figures are actuals or guidance.
- Not published
- GPU models Hardware advertised or tested, with reservations and future availability explicitly noted. Context only; not a fleet count or scoring input.
- Not published
- Operating footprint Company or service geography as sourced; a general cloud footprint does not guarantee GPU stock in each region.
- Not published
- Deployment and orchestration Available provisioning and cluster management services; future features are labelled as such.
- Not published
- Cluster interconnect Published cluster network technology or bandwidth; not a measured service-quality claim.
- Not published
- Capacity scope Partner supply, network coverage and other non-fleet capacity signals excluded from GPU scoring.
- Not published
Sources
- About TensorWave accessed 2026-11-11
- ClusterMAX 3.0 (SemiAnalysis, 23 Sep 2026) accessed 2026-11-11
- TensorWave Series B announcement, 10 Jun 2026 (article body in page JSON) accessed 2026-11-11
- TensorWave customer case study: Moreh accessed 2026-11-11
GPU prices, regions and services for TensorWave: TensorWave on Neocloud Companies.
Get GPU capacity from TensorWave and similar neoclouds
Tell us what you need once. We send it to matching neoclouds and they reply to you directly.